04 March 2025

Raxio Group’s 1.5MW data centre in the Democratic Republic of Congo (DRC) has successfully achieved the Tier Certification of Constructed Facility (TCCF) from Uptime Institute.
The Tier III certification process involved a rigorous four-day, on-site evaluation conducted by Uptime Institute engineers. Every aspect of the facility’s design and construction was thoroughly tested, inspected, and verified to ensure full compliance with Tier III standards. Successfully passing every test validates that the facility has been built entirely in accordance with the approved design documents, underscoring Raxio’s technical expertise and unwavering dedication to quality.
“Achieving the TCCF for our DRC data centre is a significant milestone for Raxio Group. This certification not only demonstrates the resilience and adaptability of our team in overcoming many challenges but also reinforces our commitment to building and operating state-of-the-art data centres in emerging market,” said Robert Saunders, CTO, Raxio Group.
With this latest certification, Raxio now boasts three Tier III certified facilities across its growing portfolio, further solidifying its reputation as a leading provider of cutting-edge data centre solutions in Africa.